Bath under the dormer
A new bathroom on the top floor, which meant a new riser through two closets.

Where
Highland Park
Area
Kind of job
Bathroom
Time on site
Two weeks
Service
A new bathroom on the top floor of a house whose plumbing stopped at the floor below. The old half-inch line would have given a shower you could count the drops of.
What we did
We ran a new three-quarter riser from the basement through two closets, with a pressure-balancing valve at the top, and brought the waste down inside the same chase.
New riser, basement to top floor
Bath, basin and toilet first fix and second fix
Chase closed up and ready for the painter
Two weeks, working around the tiler.